Laserfiche WebLink
Review Checklist for Subsidence Monitoring Report <br />Mine: Foidel Creek Date this review was completed: NOV¢mher 1, 200$ <br />Permit No.: C-1982-056 CDMG reviewer: Byron G. Walker <br />Report period: 1st half 2005 <br />Panel(s) mined during report period: 17 Right <br />This monitoring report covers that period of time where portions of the 17 Right panel of the <br />Northern Mining District was undermined [see report, Foidel Creek Mine -Permit No. C-82- <br />056 First Half-Half 2005 Subsidence Report, August 8, 2005, and Table 4, Exhibit 7e-8, of <br />the Permit Application Package (PAP)]. <br />Monitoring requirement <br />(regulation citation) <br />Permi[ requirement In <br />compliance: <br />Comment <br /> Yes/no? <br /> PAP, pages 2.05- <br /> 184.10and 2.05-191.4. Appropriate surveys had been <br />2.05.6(6)(c)(i)(A) The requirement of this <br />Previous subsidence <br />made <br />Monuments shall be rule has been limited to . <br />monitoring has demonstrated that <br />installed and surveyed monitoring of selected Yes subsidence predictions were <br />prior to the structures and conservative and provided <br />commencement of renewable resource acceptable descriptions of <br />mining lands. See Rule expected subsidence. <br /> 2.05.6(6)(c)(i)(C) <br /> below. <br />2.05.6(6)(c)(i)(B) pAP, page 2.05-184.10. Total surface strain was <br />Monuments shall be The requirement of this determined by locating <br />situated to appropriately rule has been limited to monuments at expected points of <br />monitor ground surface monitoring of selected minimum strain (over gateroads), <br />movement, vertical and structures and maximum strain (over mid- <br />horizontal, within the renewable resource Yes panel), and in areas of transition. <br />area proposed to be lands as for the rule In this report, subsidence on rail <br />undermined, including above. See Rule monuments was tabulated to <br />an area to accommodate 2 05.6(6)(c)(i)(C) indicted total subsidence of the <br />the predicted angle-of- below. rail line (R-stations). <br />draw. <br />2.05.6(6)(c)(i)(C) The PAP, pages 2.05- <br />orientation <br />location and 184.10 and 2.05-191.4, <br />, <br />elevation of each and the 2005 Map. A section of the Union Pacific <br />structure within the Only those structures Yes Railroad and a section of Fish <br />permit and adjacent Within the approved Creek were undermined. The <br />area shall be monitored affected area are <br />. monitored. <br />2.05.6(6)(c)(i)(D) PAP, page 2.05-185 Visual inspections were <br />Monitoring of Monitoring was conducted daily when appropriate <br />established monuments accomplished at least (see page 1 of the report). Daily <br />and structures shall be quarterly, scheduled by Yes surveys were reported. The <br />performed at least time mining progress. section of Fish Creek was <br />quarterly, commencing As an example, Station surveyed before and after <br />one month prior to the 402 (center of Panel underminin . <br />