My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-01-13_REPORT - M2001022
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2001022
>
2003-01-13_REPORT - M2001022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 2:38:23 PM
Creation date
11/27/2007 3:46:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001022
IBM Index Class Name
Report
Doc Date
1/13/2003
Doc Name
Annual Fee/Report Notice
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1'o~£Ca,~d ~Eady-cll~i:z ~oaczrrts, ~n~. <br />- ~ .- ~~ _ <br />_ , CONCRETE, SAND & GRAVEL -.:~ <br />I <br />Phone (970) 667-2680 ~' ~ ~ Fax (870) 667-0036 <br />P.O. Box 298 -Loveland, Colorado 80539-0299 ,, <br />GREEN/CROISSANT PROPERTY SAND AND GRAVEL MINE <br />PERi`urNO: M-2001-022 <br />RECE~~ED <br />SAN ~ 3 ?003 <br />Division o/Minerals and Ceolo9Y <br />ANNUAL REPORT FOR 2002 <br />No actual production of washed sand and gravel occurred in 2002. Extraction of <br />pit run material occurred in the westerly end of Cell 1 (Area 1) with the material <br />extracted used to surface the yazd azea. Approximately 12,000 c.y. of material were used <br />in surfacing the yard. <br />Dewatering trenches as shown on the map have been established and Cell 1 and <br />the west end of Ce112 are being dewatered. The topsoil from Cell 1 and Area 2 has been <br />stripped and placed in the Temporary Berm. The Temporary Berm has been seeded and <br />shrubs and trees planted. <br />Overburden from Cell 1 has been backfilled into Area 1 and overburden from <br />Area 2 has been stockpiled in Area 1. Area 2 has been stripped and will be excavated <br />and the material stockpiled to create a wash water pond. The crushing and washing plant <br />is being assembled and should be operational in February of 2003, weather permitting. <br />Mining of Cell 1 will progress during 2003 with concurrent reclamation starting <br />on the west end and moving eastward. Operation should continue on ayear-around basis. <br />Approximate Acreage Involved <br />Cell 1 2.9 Acres <br />Area 1 0.6 Acres <br />Area 2 1.0 Acres <br />Surfaced Yard 7.0 Acres <br />Berms 0.8 Acres <br />We will forwazd the Pipeline Monitoring Survey in April for your review per the <br />approved plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.