My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP23551
DRMS
>
Back File Migration
>
Report
>
REP23551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:53 PM
Creation date
11/27/2007 3:45:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Report
Doc Date
12/11/2001
Doc Name
INTRODUCTION
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 TABLE 1 <br />GROUND WATER MONITORING REQUIREMENTS DURING <br />I TEMPORARY CESSATION -NEW HORIZON 1 (NUC111) MINE <br /> MONITORING FREQUENCY <br />SITE FORMATION WATER LEVEL WATER QUALITY <br />GW-N1 Underburden Semiannual - <br />GW-N1P1 Underburden Semiannual - <br />GW-N3 Underburden Semiannual Annual <br />GW-N4 Dakota Coal Semiannual - <br />GW-N4R Dakota Coal Semiannual Annual <br />GW-N6 Underburden Semiannual - <br />GW-NS Overburden & Coat Semiannual - <br />GW-N9 Overburden & Coal Semiannual Annual <br />GW-N10 Spoil Semiannual Annual <br />GW-N11 Underburden Semiannual - <br />GW-N24 Overburden, Coal, <br />Underburden Semiannual - <br />GW-N25 Overburden, Coal, <br />Underburden Semiannual - <br />GW-N26 Spoil Semiannual - <br />GW-N27 Spoil Semiannual Annual <br />GW-N28 Spoil Semiannual - <br />Spoil Spring 1 Semiannual Semiannual <br />Spoil Spring 2 Semiannual Semiannual <br />1. Groundwater levels measured in April and September. <br />2. Groundwater quality analyzed in September. <br />3. Spoil spring discharge measurements and quality analyses in April and September. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.