I. SURVEY DATA <br />• The coordinate locations of subsidence monuments that are <br />currently being monitored are tabulated in Appendix A. First <br />quarter monitoring was not performed because of inaccessible <br />monuments. <br />II. MAPS <br />A. Plan View <br />The attached map (drawing FC-14-8601) shows a plan view of <br />the existing underground workings (updated to January 1, 1988), <br />future mining projections, surface topography and structures, and <br />subsidence monument locations. <br />B. Cross Section <br />The attached cross section (drawing FC-14-8402) shows the <br />three monuments installed in the location of Foidel Creek. These <br />monuments are designated FC-2, FC-3, and FC-4. The attached cross <br />section (drawing FC-14-8602) shows the surface subsidence monuments <br />installed to monitor surface movement associated with underground <br />mining of 1st Panel South. Note that this cross section map is <br />drawn showing each monument elevation referenced at ground level <br />equals zero. This allows a more useful vertical scale to be used <br />which will better illustrate the relative subsidence. These <br />monuments are designated SM-7 through SM-24 (transverse section), <br />• and SM-19, SM-25 through SM-41 (longitudinal section). Underground <br />mining continued to progress beneath some of these monuments in <br />January, June, and July, 1987, while no mining occurred from February <br />through May, and August through December, 1987. No cross sections <br />are included for the spoils stability monuments because only one <br />monument is installed along the slope dip at each location. These <br />monuments are designated SP-2, SP-3, and SP-4. <br />III. HYDROLOGY <br />The underground mine is dewatering the adjacent Wadge <br />overburden aquifer. Water monitoring data will be included in the <br />annual hydrology report. <br />IV. STRUCTURES <br />Coal production has occurzed in 1st Main North, 1st Panel <br />South, 1st Headgate West, and 1st Tailgate West. In 1st Panel <br />South, partial extraction of pillars continued through January, 1987, <br />and discontinued from February through May, 1987; partial and full <br />pillar extraction resumed again in June, and July, 1987. Several <br />surface structures associated with the underground section of 1st <br />Panel South have been surveyed. These structures are shown on <br />drawing FC-14-8601 and include two buried water tanks, CYCC office <br />• building, and a gas storage tank. Also, monitoring of the CYCC <br />training building began in March, 1987, and monitoring of two new <br />buried water tank locations began in December, 1987, and will be <br />monitored on a quarterly basis. <br />