Laserfiche WebLink
.A III IIIIIIIIIIIIIIII <br />I QUARTERLY INSPECTION REPORT <br />COAL WASTE BANKS <br />RECEIVED <br />Rules 4.09(11) and 4.10(2)(2) <br />JUN 23 2000 <br />M <br /> <br />Waste Bank No: /"Gq~ l~G~yG ~oPMen't ~457tc° <br />General Description or Reference to Site Plan: <br />^ Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25 (a) through (c) <br />L~Jew Elk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surtace Drainage System <br />8 Geology <br />^ Placement of Underdrain(s)' <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-year 24-hourappurtenant drainage structures, evidence of positive <br />drainage. <br />The ~u/v:°~~ in tl~~ norr~~st 4~'c9 was Si/~~ <br />I it 45 L° Vicfe.~lcc~~ br S~`4nq~in~ w,=1 ~e r' e/pSr'+"~9'`I o ~ 7~ a° <br />Cu ~v~T7~ <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slo/p~es of sides and faces, construction methodology. <br />6 40 nn4~aQ%t%DH a~ ~`I QP~rs 70 ~i~iv~. 6~•~ Pl4Cro% <br />~- ~k'oo7-~'D ~' was ~orMP~ u/ i ~l Ct 1~~~~1 ~t-~- ~Pe ~ ~-/e <br />o~u~fp t~uc~'. S~vef4/ so,~ q~e4s ~e~~ ode-~~~~ Tl e <br />~ifw, p '~'uc,~ l~~~e 5'fzrck i~ one o~t~ese 4~e~s <br />Tj e 50~ Qreas Sir/.~ 6e r%pPP~~ 4i r or/'~~ 9H~ COM~~~°~- <br />.lob No. 28,170 Page 1 of 2 <br />