Laserfiche WebLink
III IIIIIIIIIIIII III • <br />999 <br />r~ <br />h Notice of Intent to Continue Mining Operations ~~- r <br />112c Construction Materials Annual Report <br />Permittee Name: R M Hiner Construction Co Inc I~pl L L 1991 <br />Permit No. M-77-151 J <br />Operation Name: Greeley Pit* <br />Anniversary Date: January 30, 1997 _._,,..c:Ji09y <br />Total: $550.00 (Due on your Anniversary DaQ~1'~'~t' <br />1. a. Permitted acreage: No change b. County where mine is located: Weld <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br /> Does this mine operate MORE or LESS than 1B0 days per year? MORE LESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:+ 3.2 <br />5. Total acres reclaimed for the report year:+ 1.3 <br />6. Total number of acres in topsoil replacement stage: 1.3 <br /> a. Average thickness of topsoil replaced: 6 inch <br />7. Total number of acres seeded: n/a <br /> a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: n/a <br /> a. Date reclamation began: n/a <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* n/a <br />10. Estimated total acres to be affected in the next report year:* 1.3 <br />11. COMMENTS: We will complete the topsoil this 1997 year with plans of <br />seeding and fertilizer spreading in the fall of 1997. , <br />+ Please show the location of the acreage for items 4 - 6 on your map++.(see reverse <br />Indicate the phases of the reclamation which have been completed, correlated with side) <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />*+ NOTB: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then ~a~n',ew,,~ma~p is unnecessary. However, this must be stated above. <br />Signature: !~^ ~' ` ~~'~~`~' Date: January 21, 1997 <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: Rex M Hiner Phone: ( 970 > 356-2660 <br />FAX NO: ( ) none <br />Company: R M Hiner Construction Co Inc <br />Address: 2220 '0' Street <br />Greeley, Colorado 80631 <br />Federal Tax ID No. or Social Security No.: FEIN <br />