Laserfiche WebLink
<br />Battle Mountain Resources, Inc. <br />San Luis Project <br />DMG Permit No. M-88-112 <br />May 2002 Monthly Report <br />Page 2 <br />Table 1- May 2002 Piezometer/Well Depth to Water Measurements <br />Piezometer/Well Date Depth to Water (feet) <br />M-1 5/30/02 73.98 <br />M-10 5/30/02 25.74 <br />M-I1 5/30/02 37.55 <br />M-11R 5/30/02 44.66 <br />M-16 5/30/02 23.53 <br />M-17 5/30/02 33.43 <br />M-l8 5/30/02 __ ______ 27.73 _._._____ <br />M_ly 5/30/02 25.58 <br />M-20 5/30/02 26.22 <br />M-21 5/30/02 19.05 <br />M-22 5/30/02 17.47 <br />M-23 5/30/02 45. l7 <br />M-24 5/30/02 26.85 <br />M-25 5/30/02 DRY <br />M-26 5/30/02 17.67 <br />M-27 5/30/02 DRY <br />M_2g 5130/02 26.35 <br />M-29 5/30/02 28.48 <br />M-30 5/30/02 2639 <br />M-31 5/30/02 44.31 <br />M-32 5/30/02 49.28 <br />M-33 5/30/02 44.50 <br />M-34 5/30/02 23.77 <br />PW-1 5/30/02 29.23 <br />PW-2 5/30/02 29.42 <br />PW-3 5/30/02 36.90 <br />pW-4 5/30/02 31.43 <br />PW-5 5/30/02 27.55 <br />DW-1 5/30/02 34.18 <br />DW-2 5/30/02 26.82 <br />SP-1 5/30/02 17.07 <br />SF-IR 5/30/02 18.87 <br />SF-2 5/30/02 26.82 <br />SP-3 5/30/02 43.42 <br />SFA 5/30/02 26.95 <br />SF-5 5/30/02 33.44 <br />D8724 5/30/02 60.24 <br />BF-1 5/30/02 28.77 <br />BF-2 5/30/02 32.37 <br />BF-3 5/30/02 30.68 <br />BF-4 5/30/02 25.92 <br />BF-SR 5/30/02 31.70 <br />BF-6 5/30/02 31.83 <br />BF-7R 5/30/02 40.66 <br />BF-8 5/30/02 DRY <br />BF-9 5/30/02 39.87 <br />