Laserfiche WebLink
January 26, 2004 <br />Bowie No. 2 Mine Subsidence <br />Survey Oct-Nov 2003 <br />• LINE-21 <br />Not Surveyed in October -November 2003 <br />STA Date Node# Northing Easting .Elevation Description <br />21-A 2002 1807 33409.25 33745.55 7592.15 REBAR-CAP <br />21-B 2002 1808 33020.48 33791.01 7612.54 REBAR-CAP <br />21-C 2002 1809 32731.09 33892.26 7616.58 REBAR-CAP <br />21-D 2002 1810 32335.70 34043.25 7628.56 REBAR-CAP <br />21-E 2002 1811 32029.19 34230.00 7647.77 REBAR-CAP <br />LINE-22 <br />Not Surveyed in October -November 2003 <br />22-A 2002 1812 31620.41 34693.00 7666.57 REBAR-CAP <br />22-B 2002 1813 31502.82 35198.41 7647.75 REBAR-CAP <br />22-C 2002 1814 31361 <br />34 35663.00 7595.83 REBAR-CAP <br />• . ' <br />22-D 2002 1815 31315.04 35950.93 7589.81 REBAR-CAP <br />• <br />S2-20 <br />