Laserfiche WebLink
I~ <br /> <br />• <br />Tali}aof Contents <br />Section <br />I.0 MTRODUCT[ON AND BACKGROUND <br />Paee <br />2.0 OWNERSHIP INFORMATION, FACILITY DESCRIPTION, SPILL HISTORY 1 <br />3.0 CERTIFICATIONS b <br />4.0 SPILL PREVENTION AND BEST MANAGEMENT PRACTICES 7 <br />5.0 SP[LL CONTROL, RESPONSE, AND REPORTING PROCEDURES 9 <br />b.0 MATERIALS STORED ONSITE 1 I <br />7.0 POTENTIAL SPILL MAGNITUDE 22 <br />8.0 LOCATION OF SPILL CONTROL AND CLEAN-UP MATERIALS ONSITE 23 <br />9.0 EMPLOYEE TRAINING 23 <br />10.0 UPDATING THE SPCC/MCP 24 <br />11.0 ONGOING PROJECTS AND SCHEDULE FOR IMPLEMENTATION 24 <br />List of Figures <br />Figure 1. General Arrangement--Henderson Mine, Mill and Transfer Station Area Map <br />Figure 2. General Arrangement--Henderson Mine Yard Plan <br />Figure 3. Urad Valley Site Map <br />Figure 4. Urad Subdrain Collection and Pond Treawent System <br />Figure 5. Urad Water Treatment Plant Process Flow Sheet <br />Figure 6. General Arrangement--Mine Fuel System Fuel Storage <br />List of Aooendices <br />Appendix A. Surface Drainage <br />Appendix B. List of Hazardous Substances and Reportable Quantities <br />Appendix C. Telephone Numbers for Spill Reporting <br />