My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP23289
DRMS
>
Back File Migration
>
Report
>
REP23289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:44 PM
Creation date
11/27/2007 3:40:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Report
Doc Date
9/25/2006
Doc Name
2006 Revegetation Monitoring Report /Year 10
From
Energy Fuels Coal Inc
To
DRMS
Permit Index Doc Type
Reveg Monitoring Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
energy fuels coal, inc. i <br />aouthtlaid mine poet office bax 669 Florence, Colorado 81226 (7t9) 786.6396 <br />September 22, 2006 <br />Mr. Jim Burnell -Environmental Protection Specialist REC E ~ VE D <br />Division of Reclamation, Mining & Safety <br />1313 Sherman Street -Room 215 SEP ~ 5 `L006 <br />Denver, CO 80203 <br />Divis+on of ne;+amation, <br />Mining and safety . <br />RE: Kerr (Marc) Mine -Permit No. C-1980-006 <br />Revegetation Monitoring Report -Year 2006 (Year 10) <br />Dear Jim Burnell: <br />Enclosed, please find two (2) copies of the 2006 (Yeaz 10) Revegetation <br />Monitoring Report for Reclaimed Areas at Kerr Coal Company's Marc Mine. Also, one <br />(1) single copy was mailed directly from the consultant's office to your attention on <br />September 21, 2006 - - a total of three (3) copies of the report are being submitted for the <br />Division's review. Sampling and reporting was conducted by I.M.E. of Yampa, <br />Colorado, under the direction of Mr. Kent Crofts. The vegetation sampling was done <br />dwing the summer season of 2006 and the respective report was recently completed. The <br />sample and report procedure was for monitoring requirements for Year 10 of the ten yeaz <br />reclamation liability period preparatory to Phase III, Final Bond Release Request. <br />In the conclusion of their report, I.M.E. states that, "all of the 2006 revegetation <br />monitoring data as well as the 2005 data confirms that the appropriate Phase III Bond <br />Release criteria for all areas sampled have been satisfied". <br />If you have any questions or comments, please contact me. <br />Sincerely, <br />~~ o <br />rge V. Patterson <br />Gen Mine Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.