Laserfiche WebLink
3Lambert anD 2,ssaciatcs <br /> CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br /> DAILY FIELD REPORT <br /> PROJECT NUMBER M89005MT DATE Wednesday 3-29-89 <br /> PROJECT NAME West Elk Coal Mine TECHNICIAN D.N. <br /> PROJECT LOCATION Somerset, CO WEATHER CONDITIONS Cloudy, rain <br /> CLIENT West Elk Coal CO WORK REnUESTED Density tests <br /> CONTRACTOR West Elk Coal CO FOREMAN Mike Price <br /> WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS ) <br /> I arrived at the project site at 10:45 A.M. . After thirty (30) minutes standing by, <br /> Mr. Mike Price , West Elk Coal CO. , informed me of test locations. I performed four <br /> (4) density tests by Nuclear method and four (4) moisture content tests by speedy <br /> method. Test results were given verbally to Ms. Kathy Welt, West Elk Coal CO. The <br /> test results indicate only the relative compaction and soil moisture content of the <br /> material at the location and elevation tested at the time of our site visit. I left <br /> the project site at 1:30 P.M. . <br /> P.0 BOX 3986 P O.BOX 0045 463 TURNER. 104 A <br /> GRAND JUNCTION C081502 MONTROSE.C081402 DURANGO.C081301 <br /> (303)245.6506 (3031 249.2154 (303)259-5095 <br />