My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP23240
DRMS
>
Back File Migration
>
Report
>
REP23240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:43 PM
Creation date
11/27/2007 3:39:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
8/6/1997
Doc Name
BOWIE RESOURCES LTD BOWIE 1 MINE QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT 2ND QTR 1997
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • III IIIIIIIIIIIII III <br />Bowie Resources Ltd. <br />Bowie #1 Mine <br />Quarterly Waste Disposal Area Inspection Report <br />2nd Quarter of 1997 <br />Item Yes1No Comments <br />1 puantiy of waste material added to waste disposal Yes Approximatey 27 cutyrs. of gob was added to the <br /> area during reporting period. waste disposal pile during this reporting period. <br />2 Waste material deposited and compacted in No Waste material was not compacted during tltis <br /> 24 inch lifts? reporting period. <br />3 Drainage alterations constructed? No No drainage alterations were constructed during this <br /> reporting period. The existing drainage pattern was <br /> maintained around the perimeter of the pile to protect <br /> outslopes and direct drainage at the toe of the pile. <br />4 Present height of waste material? Highest height approximately 99 feet <br />5 New bench constructed? No <br />6 Refuse material oufslopes placed at 1 V:2V outslopes? Yes Slopes were checked for proper placement during <br /> previous inspections. <br />7 Adequate drainage on top of completed fill? Yes Grading was maintained an top of completed fiA lifts <br /> to ensure proper drainage from top of pile. <br />6 Bench drainage adequate? Yes Bench drainage was maintained thoughout the quarter. <br />9 Outslopes covered with 4 foot non-toxic, NA No outslopes were covered during this reporting period. <br /> noncombustible material? <br />10 Berms constructed an outslopes? Yes <br />11 Evidence of structural defects? No <br />12 Topsoil adequatey salvaged and stored? NA No additional topsoil was salvaged during this reporting <br /> period. <br />13 Trash removed? Yes Trash was removed upon delivery of gob to refuse pile <br /> during this reporting period. <br />14 Additional comments? No Drainage control was monitored and maintained <br /> throughout the 2nd quarter of 1997. (This include <br /> drain from Oulfall 001 <br />I certify the above report as being accurate to the best of my knowledge. <br />-~.~=~ <br />QR7GOBXLS 72a197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.