My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-05_REPORT - M1977376
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977376
>
2006-09-05_REPORT - M1977376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 8:39:32 AM
Creation date
11/27/2007 3:38:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977376
IBM Index Class Name
Report
Doc Date
9/5/2006
Doc Name
Annual Fee/Report/Map
From
Continental Materials Corporation
To
DRMS
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Sheet <br />2006 Annual Report <br />Canyon Dolomite Quarry <br />M-1977-376 RECE~ 1~J~D <br />Continental Materials Corporation SEP OS p006 <br />Anniversary Date: September 22 Divisron <br />Mining and Sa e(y'on <br />Overview of Permit Year: During the 2005 J200G operating year a majority of the musing activity occurred in <br />a small area completely contained within previous disturbed lands. Only a small amount of material was mined. <br />Effort was expended in planning fox a larger operation that will be done with a new mining plan that is yet to be <br />developed. Most of the effort in the last year was spent determining reserves and where the reserves are located. <br />Annual Report Maps: There are two annual report maps included in this report. Map 1 shows the overall site <br />and the location of the pexxnit boundary and the detailed map in Map 2. Map 1 is not to scale. Map 2 shows the <br />actual location of activity and the direction of expected future mining. <br />Affected Lands: All disturbance in the last year was within previously disturbed land. No unaffected ]and was <br />affected. Until a new mining plan is developed, which will require a permit amendment to implement, all mining <br />activity is being contained within akeady developed land within the permit. <br />Work Anticipated in 2006/2007: Any additional mining will be done within the 2006/2006 mining area with <br />some chance that it might move a bit further to the south as shown on Map 2. It is expected that additional <br />work will continue with developing a new mining and reclamation plan for the site, but at this point it is not <br />known when that planning will be done so an amendment can be prepared. Currently, the nature and extent of <br />the deposit is being determined as closely as possible so a plan for extraction can be developed. <br />Bonding: This operation is covered under a self bonding arrangement. <br />Continental Materials 2006 Annual Report M-1977-376 Ganyon Dolomite Quarry Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.