My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP23191
DRMS
>
Back File Migration
>
Report
>
REP23191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:41 PM
Creation date
11/27/2007 3:38:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Report
Doc Date
10/31/1988
Doc Name
REPONSE TO 1ST AND 2ND QUARTER 1987-88 WATER YEAR HYDROLOGY REPORTS PN C-81-071 AND C-84-062
From
CYPRUS YAMPA VALLEY COAL CORP
To
MLRD
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. - • <br />Mr. David Berry <br />.dage <br />Page 7 <br />There was insufficient water in the well to allow for obtaining a sample. <br />MLRD COMMENT: <br />Surface Sites ~ <br />1. Please explain the lack of data for sites 100 and 900 in the second <br />quarter Hydrology Report. Also, CYCC must develop a plan to ensure <br />that the CYCC/USGS Sites 700 and 900 are monitored as required. Please <br />refer to the above comments regarding this issue. <br />CYVCC RESPONSE: <br />Please refer to response for question 4. <br />MLRD COMMEIJT: (L`! <br />2. The report indicates that the March 1988 stage level for Station 29 <br />exceeded the boundaries of the existing rating curve. Accurate <br />discharge values must be obtained for all sampling events. Please <br />provide a plan to revise the curve or to use an alternate discharge <br />measurement method when the existing rating curve limits are not <br />adequate. <br />CYVCC RESPONSE: <br />The development of a rating curve is an ongoing procedure, and the rating <br />curve may be modified as additional measurements are obtained. <br />Also, a new suspended gage has been installed at Station 29. This should <br />help in obtaining accurate stage measurements. <br />MLRD COMMENT <br />3. Please ~~''`explllain the reason for missing the March 1988 full suite water <br />quality sample (Station 29). The approved plan requires such a <br />measurement if the stream is ice-free. <br />CYVCC RESPONSE: <br />The stream was not ice-free, therefore, it was decided to wait until April <br />to obtain the sample. <br />If there are remaining questions, please contact me at your convenience. <br />
The URL can be used to link to this page
Your browser does not support the video tag.