My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP23106
DRMS
>
Back File Migration
>
Report
>
REP23106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:38 PM
Creation date
11/27/2007 3:38:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Report
Doc Date
10/28/1997
Doc Name
1996 ANNUAL HYDROLOGIC REPORT MUNGER CANYON MINE C-81-020 MCCLANE CANYON MINE C-80-004
From
DMG
To
GRAND VALLEY COAL CO
Annual Report Year
1996
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5.1 <br />2 5 SURFACE WATER MONITORING PROGRAM <br />A water quality monitoring program has been established to monitor the effect of mining <br />activities. Portions of this monitoring program, as well as the ground water monitoring <br />program, described in Section 2.6 will cover both the Munger Canyon and McClane Canyon <br />mines which operate in close proximity to one another in the same major watershed. Locations <br />of all surface water monitoring sites are shown on Figure 4.2-2.1s in Volume VII. <br />The quantity of flow at SW-1 will be measured quarterly, contingent upon the availability of <br />water. The design of the bridge over East Salt Creek at McClane Canyon was developed to <br />allow easier monitoring of flow. A flow rating chart has been developed to ensure consistence <br />of flow measurements. Flow measurements will also betaken at SW-3, in Munger Creek below <br />the mine site. The measurements will ideally be taken twice a year if water is available to ,'. <br />sample. Measurements will be taken once during spring snow melt and once during a storm <br />event. Flow rating charts for both East Salt Creek and for the culvert at SW-3 are presented as <br />Table 2.5.3. <br />Water ali samples of East Salt Creek will be collected quarterly at sites SW1, SW-4,and <br />SW-8 as shown on Figure 2.3-5. Water quality samples will also be taken on Munger Creek and <br />..~ - <br />its tributaries at sites SW-3, SW-6, and SW7 twice a year; once during spring snow melt and <br />--` <br />once during a storm event (spring or summer). Table 4.5-12 shows the results of the April, <br />1981 laboratory analyses from East Salt Creek monitoring locations SW-1 and SW-4. All water <br />samples will be analyzed for the parameters shown in Table 2.5.2. The results of all monitoring <br />will be submitted to the Regulatory Authority immediately following receipt of analytical results. <br />During periods of temporary cessation, the monitoring program will be modified as follows. <br />Water quality samples will be taken quarter) fr~Om SW-3. Samples will be analyzed for those <br />parameters listed in the temporary cessation portion of Table 2.5.2. The quantity of flow will <br />be measured at SW-3 when samples are collected. <br />Mu Volume I 1 -9 -96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.