Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />December 2003 Monthly Report <br />Page 3 <br />Table 2 -December 2003 Tailing Disposal Area Piezometer Depth to Water <br />Measurements <br />Piezometer Date Depth to <br />Water feet Total Depth <br />ft Volume of <br />Water ft <br />P6 12/30/03 Dry 72.46 0.00 <br />P7 12/30/03 92.30 92.50 0.20 <br />P8 12/30/03 96.89 97.51 0.62 <br />P9 12/30/03 71.78 72.30 0.52 <br />P10 12/30/03 57.42 58.30 0.88 <br />Pll 12/30/03 41.28 41.80 0.52 <br />P12 12/30/03 41.71 41.65 0.06 <br />P13 12/30/03 41.02 41.34 0.32 <br />P14 12/30/03 Dry 41.24 0.00 <br />P15 12/30/03 Dry 41.10 0.00 <br />During December 2003, approximately 145 tons of water treatment plant sludge was <br />transferred from the drying pad to the tailing facility. Table 3 presents water treatment <br />plant sludge management for calendar year 2003. <br />Table 3 -Calendar Year 2003 Water Treatment Plant Sludge Management <br />Date Approximate Tonnage <br />Mana ed Sludge Disposition <br />March 12-I5, 2003 670 Tailin Facility <br />A ril 17-18, 2003 160* Dr in Pad <br />Jul 25-26, 2003 10 Tailin Facilit <br />Se tember 10-14, 2003 150 Tailing Facilit <br />Se tember 18-19, 2003 150 Drying Pad <br />Se tember 27-30, 2003 120 Tailin Facilit <br />October 1-8, 2003 145* Tailin Facilit <br />December 10-30, 2003 145 Tailin Facility <br />* Quantity previously reported was corrected to reflect the estimated quantity transferred from the drying pad to the <br />tailing facility. <br />Demolition of the San Luis mill facility was initiated during December. SVL <br />Earthmover's Inc. initiated dismantling of the mill equipment during the month. <br />Activities during the month focused primarily on the removal of the mill balls and mill <br />liners. Conversation with the contractors, tematively it is scheduled that final mill <br />demolition and reclamation will be completed during Spring 2004. <br />