Laserfiche WebLink
k5uena • Over Mtiat period <br /> c. Watering <br /> V. Evaluation of success <br /> a. What areas need additional badcfilling? <br /> b. «at areas need additional shaping? <br /> C. Wnat areas need additional planting? <br /> VI. Plan for the following year <br /> Permit Previous P—eport <br /> a. mining Cent plan Specification Projection <br /> 1. z Acres to be <br /> stripped <br /> Locations <br /> 2. ; Acres to be Approximately 2 in Stage 1 <br /> excavated <br /> Locations <br /> b. Reclamation <br /> 1. 1 Acres to be <br /> backfilled <br /> Locations <br /> D <br /> 2. ; Acres to be <br /> graded <br /> Locations <br />