Laserfiche WebLink
~ rI(Qlal MORRISON-KNUDSEN COMPANY, INC. <br /> <br /> <br /> <br />i <br />~~ <br />'o e'_esE?n``dxi-s~uss;ion~s w~th,mi,ge p~e.r~sorinel Yindicatgd~th~a~t jtho.ugh seega4e~~iWlt~. <br />~the.pit has been observed after a rain .through-=the oit'!~alls: seeoaae.~from~^ ' <br />the s,poil.p.ile slopes has no.tbeen reported., No seepage from the slopes of I~~ <br />the spoil pile was observed, and the roadside drainage ditches were dry ~11~ <br />during the site visit. ~h.e.~efrore; forjpurposes of analy is,._]b was,assume,• <br />'~ +t the slope is we71 drained and ho hO re'"- - ~~`~ar-; ~-t~ ~'>~f~i~ i <br />~ti <br />~k:, <br />After analyzing several variations of slope geometry and spoil properties .*;ti,' <br />by manual methods, two slope conditions were analyzed by computer -- one ' <br />using the very conservative values back-calculated assuming a 40-degree <br />slope to be in a factor of safety equal to unity condition, and the other ,~ <br />using a reduction of the values reported by D'Appolonia. The slope models <br />analyzed are presented on Figures 1 and 2 attached to this report. The <br />assumed surfaces of sliding shown thereon represent the result of analyzing <br />100 surfaces for each model. ~tie;:~comT u:ter'ro -ram..:~se.'d-~; ~• <br />,Bishop ty~pe.~ana~1~y~ses'~ The prope~~,.t~i:es ;used for the s :o,i~l and. the,~res.u`l~' ~ <br />factors. of safety are tabulated belovi,.~ ~,~ <br />Slope Cohesion 0 ;Facxtoi^'ofa° <br />Model sf Degrees VSafetyi <br />d I 100 22 ~„T~ <br />II 250 28 X2,.5 <br />CONCLUSIONS <br />From the discussions above, it can be seen that based on conservativ ~~ <br />.u . F <br />estimates of the soil properties, `rs our opi-pion`that tfi~e`T=; Fae~tor~~,o, 1 <br />;s~a~f'e~ty for the static condition exceeds the. re uired;l11.5.. It is likel ~1 ((~~ <br />t at some of the slopes in the active dump area are only marginally stable.jln~d-rl <br />~lio}Yew:er, we understand that stee ;slopes, particularly those~ins~peet` ( ; <br />a'dj,acent to the southern haul road are to be re ra 9 stabl §?'` <br />!, <br />~ tionlduring reclamation. <br />-5- <br />