Laserfiche WebLink
s <br />-4- <br />f <br />• <br />• <br />CTL/Thompson, Inc. performed The permeability tests reported herein to <br />assist Leadville Mining 8~ Milling Corporation To prepare Their permit for the <br />Colorado Mined Land Reclamation Board. Consultation and analyses regarding the <br />toilings disposal area dikes or the amount or direction of water flow in the event <br />water leaves the tailings disposal area were not a part of the scope of our work. <br />Our work was limited to measuring the ground permeabilities in the field, <br />laboratory testing for soil sample classification and our general impression of the <br />impact of the ground permeabilities on The tailings disposal area construction. <br />The above summarizes our opinions. The data collected during our field <br />• <br />• <br />• <br />• <br />• <br />• <br />work and our calculations are available in our files for future reference. If we can <br />be of further service evaluating the geotechnical aspects of the tailings disposal <br />area please call. <br />CTL/T OMPS{//ON, INC. <br />~/ ~ lra2+.I~ <br />k J. Holli ~y P. E <br />Principal Engi er <br />FJfi:dd <br />(5 copies sent) <br /> <br />• <br />