My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP22866
DRMS
>
Back File Migration
>
Report
>
REP22866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:30 PM
Creation date
11/27/2007 3:34:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
11/8/1999
Doc Name
BATTLE MTN RESOURCES INC DMG PN M-88-112 MONTHLY SAMPLING
From
BATTLE MTN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iy <br />iiiiiiiuiiiiiuiii <br />BATTLE MOUNTAIN RESOURCES, INC. <br />November 07, 1999 <br />RECEIVED <br />Mr. Jim Dillie NOV 0 8 1999 <br />Division of Minerals and Geology ,~,;~,~etMineraygGeologY <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Subject: Battle Mountain Resources, Inc. DMG Permit No. M-88-112 <br />Monthly Sampling ~ - <br />Dear Mr. Dillie: <br />All required sampling was completed during the month of October. Enclosed are analytical <br />reports from Sangre De Cristo lab for the recent bi-weekly and monthly sampling periods as <br />specified in the April 1992 Abatement Plan. Analysis that have not been received will be forwarded <br />to you as I receive them. <br />The NANO/RO water treatment plant operated intermittently during the month. <br />Work continued on the stormwater diversion on Waste Rock "C" and the project is approximately <br />50% complete. <br />Approval was given by the Division for the pipeline from the evaporation system collection pond to <br />the tailings impoundment. Construction of the trench for the pipeline has not yet began. <br />All surface water stations were inspected and RS-4 and RS-6 were found to be dry. <br />Vacuum on the lysimeters was verified and no water was present to sample. <br />When we checked the piezometers on the main embankment of the tailings impoundment on <br />10/27/99, the piezometers were dry or contained below 12 inches of water. <br />The two west pit piezometers were measured for depth to water on 10/28/99, with the following <br />result: BF-1 was 14.SS.ft and BF-2 was 18.20 ft. The other piezometers in the West Mine area were also <br />checked with the following result: PW-1 was 18.21 ft, PW-2 was 17.75 ft, PW-3 was 25.57 ft and PW-4 <br />was 26.37 ft. <br />The underdrain was measured at approximately 29 gpm. <br />The collection pond's leak detection system was sampled and pumped dry. The leak was <br />measured at approximately 37 GPAD. <br />The evaporation system was in operation most of the month with the superspray system. The <br />snowblowers were removed this month. Down time was attributed To routine maintenance or <br />pump repair. <br />~~~ <br />A SUBSlDlARY OF BATTLE ,410UNTAlN GOLD COMPANY <br />P.O. Box 310 San Luis. Colorado 8119?0310 (7197 672-4132 Fax (719) 672-3363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.