Laserfiche WebLink
Kremmling Airport <br />Permit #M1978-143 <br />Activity Report <br />Mining in the Kremmling Airport Pit began on Apri13, 2001 and continued until May 9, <br />2001. During that time, 26,600 tons of material was processed into class C-6 (3/4 inch), <br />this material was stockpiled. <br />Mining in the Kremmling Airport Pit again began on November 2, 2001 and continued <br />until January 4, 2002. During that time, 22,900 tons of material was processed into class <br />C-6 (3/4 inch), this material was stockpiled. <br />Mining was resumed in this pit on April 15, 2002 and continued until May 13, 2002. <br />During this time, 19,769 tons of material was processed into 395 tons of 3 to 6 inch <br />screened rock, 1,220 tons of 1 %Z to 3 inch screened rock and 18,154 tons of class C-6 <br />(3/4"), This material also stockpiled. <br />At the end of each period of mining, the high-wall was sloped three to one for safety and <br />to prevent excessive erosion. <br />The stockpiles have been and continue to be drawn from intermittently as required for <br />county road maintenance. <br />