Laserfiche WebLink
TABLE B <br />• Fh'C110.0GIC FCMIialING PAR{METFR LISi• <br />• <br />• <br />• <br />• <br />Paraneter <br />Water Level <br />Flay <br />Terp., field <br />pH, field <br />EC, field <br />TDS <br />155 <br />SAR <br />Calcium, dis. <br />Mag~esiu~n, dis. <br />Sodium, dis. <br />Bicarbonate <br />Carbaiate <br />Sulphate <br />fadniun <br />Cad~niun, dis. <br />Lead, dis. <br />Mercury <br />Mercury, dis. <br />Selenium <br />Selenium, dis. <br />Silver <br />Iran <br />Iron, dis. <br />Manganese, dis. <br />Molybdenum <br />hblybdenun, dis. <br />Zinc <br />Nitrate & <br />Nitrite <br />Ammonia, Free <br />Phosphate, ortho <br />l,r7its <br />feet <br />cfs <br />deg. C <br />urhos/un at 25 C <br />mg/1 <br />mg/1 <br />~g/l <br />mg/1 <br />mg/1 <br />mg/1 (HC03) <br />mg/1 (LD3) <br />mg/1 <br />ug/1 <br />ug/1 <br />uq/1 <br />u9/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />uq/1 <br />ug/i <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />mg/1 (N) <br />ng/1 (N) <br />m9/1 <br />Alluvial Surface (1) Spoil(1)(2)Natural(1) <br />Wells Wells Water Springs Springs <br />S <br />S <br />s <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />M <br />M <br />M <br />M <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Mine(1)(3) <br />Ois~arge <br />Q(6) <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />•r <br />S = Semiannually (either in April or May, and then in September or Octnher) <br />Q =Quarterly <br />M = Monthly <br />NOiE: ~2) All trace metals are total recoverable. <br />(3) Spoil sprang nnnitoring frequency dependent on annual wnrey, except Site 7 and Spring 303. <br />Mire discharge at Site 109; Site 115 per NPDES Fennit CO-0042161. <br />~5) Spring 303 - Flav 8 Field parameters and Sampling to be seniarrnial. <br />Site 7 - Flay and Field parameters and Sampling during amual spring survey; <br />rereining schedule dependent on flan. <br />(6) Total flay for period as measured by meter. <br />FR 90-44 <br />Ex. 14-13 <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />0 <br />Q <br />Q <br />Q <br />Q(4)(5) <br />Q <br />Q <br />Q <br />5 <br />S <br />S <br />S <br />5 <br />S <br />S <br />5 <br />5 <br />S <br />S <br />S <br />S <br />S <br />s <br />S <br />S <br />5 <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />s <br />S <br />S <br />S <br />Revised 05/01/90 <br />