Laserfiche WebLink
iii iiiiiiiiiiiuiii <br />RAG EMPIRE CORPORATION' V1'ASTE PILE INSPECTION FORM <br />P1LE LD. NO. ]2] ]-CO-09-01370-0] (SURFACE WASTE PILE) <br />PILE 1.D. NO. 1211-CO-09-01370-02 (OLD NO. 9 EXCAVATJON) <br />DATE/TIME: %~-; ~ ~~` ~ _ ~ RE <br />INSPECTOR SIGNATURE: ~; • i/L~- ~ •t l~' ~ ~~~Tty M• <br />INSPECTOR TITLE: ~nv ~~~ <br />Under the superv~slon of Gary Buchan, Colorado P.E. <br />This inspection was conducted to comply with DMG Rule 4.09.1(1 I ). ~~ N A~ <br />This inspection was conducted to evaluate: --"" <br />~ A. Stability of fill (quarterly inspection) <br />''%ii B. Critical construction periods: <br />1. Removal of all organic material/topsoil <br />2. Placement of underdrainage system <br />3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />5. Revegetation <br />NOTES: <br />file:l:\EMEN V IRONMENTAL\EMPIREUN SPREP\ W A STEPILEFORM.DOC <br />