Laserfiche WebLink
ANNUAL REPORT <br />MID-CONTINENT LIMESTONE QUARRY <br />PERMIT: M-1982-121 <br />COUNTY: GarFeld <br />ANNIVERSARY DATE: April 25, 2006 <br />Current disturbance: No change. <br />RECEI!/ED <br />APR 15 1006 <br />Oiuision of Minerals and Geology <br />Reclamation Accomplished: None. <br />Operations: During the preceding year previously mined _ <br />-- ~ limestone materials were loaded and-~-- <br />transported from the quarry site. No mining of <br />the deposit occurred and there were no <br />additional disturbances. <br />Anticipated: Loading of previously mined limestone <br />materials is anticipated to continue. <br />Pitkin Iron Corporation <br />Diane Delaney <br />Vice President <br />