My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP22731
DRMS
>
Back File Migration
>
Report
>
REP22731
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:26 PM
Creation date
11/27/2007 3:31:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Report
Doc Date
9/25/1995
Doc Name
TOPSOIL TESTING AT GOLDEN EAGLE MINE C-81-012
From
DMG
To
KENT GORHAM
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparimenl of Nalu ral Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (3031 866-3567 <br />FA%: (303) R32-8106 <br />September 25, 1995 <br />To: Kent Gorham <br />From: Janet Binns/ <br />Re: Topsoil Test\' \) at Golden Eagle Mine (C-81-012) <br />~I~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Wvernor <br />lames S Lochhead <br />Ezec uO Ve Director <br />MichaelB Long <br />D rviaon Dneaur <br />Cathy Begej contacted me this morning regarding topsoil suitability <br />testing at the Golden Eagle Mine. There is a "soil" pile adjacent <br />to another topsoil stockpile which is derived from unknown origin. <br />Cathy did not know if it was from pond cleanings, ditch cleanings, <br />or from road maintenance. She faxed a list of parameters that <br />Basin Resources plans to test it for. I have requested they show <br />us the individual parameters of the SAR value. These parameters <br />coincide with those required in Rule 4.06.2(3), what is included in <br />their topsoil testing in the permit. <br />The operator plans to add additional soil to the two piles and <br />create one big pile. I will inform Cathy that we need to see the <br />results of the testing before they actually cover the pile with the <br />new topsoil material. <br />Let me know if you have any questions. <br />il~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.