Laserfiche WebLink
/~ Kennecott <br />~ ~ Energy , _ _ <br />Co(oa~yo CoalConr~anyL.2` ~° <br />Memorandum <br />FOR: File January 4, 2002 <br />West Pit Fill Construction Report <br />During the quarter beginning October 1, 2001 and ending December 31, 2001, <br />I inspected the area in which the West Pit Excess Spoil Fill is being <br />constructed. The purpose of these inspections was to inspect the fill surface <br />for vegetative efforts; inspect the fill for areas of water seepage or surface <br />drainage and to satisfy the requirements of CMDG.. Rule 4.09.1 (lla). <br />During the quarter very little progress was made on the West Pit Fill. No <br />overburden was hauled to backfill in the West Pit due to spoil room constraints. <br />Some topsoil was dumped on the West Pit backfill bench below the 7350 elevation <br />on the north east side of the fill. The topsoil had been spread and seeded. The <br />area was approximately 1.7 acres of reclaim. <br />Attached to this report are my certification that all construction <br />requirements have been met thus far in constructing the West Pit Excess Fill. <br />~~ <br />Stephen R. Hinkemeyer <br />Technical Services Manager <br />cc. West Pit Fill Construction Engineering Report <br />