My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP22722
DRMS
>
Back File Migration
>
Report
>
REP22722
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:26 PM
Creation date
11/27/2007 3:31:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977572
IBM Index Class Name
Report
Doc Date
3/16/1988
Doc Name
ANNUAL REPORT PN M-77-572 LAMAR EAST PIT VALCO
From
VALCO
To
MLRD
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ III IIIIIIIIIIIII III <br />:~ <br />((~~ VALCO, INC. <br />pj~~~~~~~4MARP('.ONBOX5gDIVISION <br />~~77 VLAMAR, COLORADO 81052 <br />® ~.1AR 1 G 1988 (:103) 336-2223 <br />MINI=D LAND <br />RECLAMATION DIVISION <br />March 14, 1988 <br />Plined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203-2273 <br />Re: Annual Report> Permit # M-77-572, Lamar East Pit, VALCO, Inc. <br />ANNUAL REPORT: 1987-88 <br />1. There were approximately three (3) acres mined in Part 1 Stage 0 <br />during this reporting period. We are continuing to mine using our <br />Sauerman Dragscrapper over previously mined acreage but to a greater <br />depth. The Sauerman allows us to mine deeper obtaining more material <br />with less surface acreage being disturbed. <br />2. No acres were reclaimed during this period. <br />3. No acres were backfilled, graded or revegetated during this period. <br />4. No vegetation was planted. <br />5. No fertilizers or organic material was used. <br />6. No acres were reclaimed during this period. <br />7. We anticipate approximately four (4) acres will be affected in the <br />1988-89 reporting period all in Part 1 Stage 0. <br />8. The effective date of this information is March 14, 1988. <br />Please also consider this as the required Notice of Intent to Continue <br />Mining Operations. <br /> <br />encl: check <br />map <br />form <br />William R. E:isenman <br />General Manager <br />UALCO, Inc. - Lamar <br />Concrete Division <br />flOCKV FORD PUEBLO CANON CITY <br />
The URL can be used to link to this page
Your browser does not support the video tag.