My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP22558
DRMS
>
Back File Migration
>
Report
>
REP22558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:21 PM
Creation date
11/27/2007 3:29:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
Report
Doc Date
9/26/1996
Doc Name
1996 ANNUAL REPORT BROMLEY LAKES PIT FN M-87-049
From
HALEY & ALDRICH
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTIC>~ INTENT TO CONTINUE MINING ~TIONS <br />112 ANNUAL REPORT '''~ r, __ <br />Permittee Name: Ready Mixed Concrete Company <br />Permit No.: M-87-049 SEF 2 6 1996 ~~~~ <br />Operation Name: Bromley Lakes O ~~ <br />TAnniversary Date: $550.00 (Due on your Anniversary Date) M(NERA~S $ ~. ' <br />~ V~GG v <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? YES N® <br />Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br />2. Does this mine have a phased reclamation plan? YES NO <br />3. Permitted acreage: 392 <br />4. Total acres affected during the report year:* 10 <br />5. Total acres reclaimed for the report year:* 2 <br />6. Total acres in various stages of reclamation:* <br />a. Backfilled: <br />4 <br />d. Topsoil replaced: <br />4 <br />b. Graded: <br />c. Seeded: <br />List species seeded & seeding rate <br />for report year on <br />Average topsoil <br />thickness replaced: <br />2ft <br />7. The type and approximate quantity of fertilizers, organic material or soil conditioners used for the report year:*_ <br />None used during the report vear. <br />8. Estimated total acres to be affected in the next report year:* 0 Acres <br />9. COMMENTS: Sipe reclamation of the Phase 3A mining area will be conducted in the coming_year. <br />* Please show the location of the acreage for items 4 - 6 on your map.** <br />Indicate the phases of the reclamation which have been completed, correlated with your timetable. <br />** NOTE: If there have not been any changes since the last annual report and you previously submitted a map which <br />correctly depicts the current acreage in items 2 through 6, then a new map is unnecessary. However, you must state this <br />fact above. <br />Signature: ~ ~~ LZ~ Date: Seotember 26. 1996 <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: E. W. (Bill) Timmons. III Phone: 0031292-1771 <br />Company: Ready Mixed Concrete Companv <br />Address: P.O. Box 2290 <br />Denver. CO 80201 <br />Federal Tax ID No. Or Social Security No.: <br />G: \PROniC7S\]02]0\96ANNUAL W PD <br />
The URL can be used to link to this page
Your browser does not support the video tag.