Laserfiche WebLink
<br />TABLE 1 <br />FOIDEL CREEK MINE <br />RECLAMATION SUMMARY <br />AREA DISTURBED ACREAGE STATUS <br />Fish Creek Borehole 3.5 (w/road) ACPiVE <br />Sandstones Substation 1.0 IDLE <br />Fish Creek Tipple 13.5 IDLE <br />Surface Facilities 322.0 ACPIVE <br />Drill Pads <2 RFY7aTM <br />Rock Dust Tank 0.5 ACITVE <br />Coal Refuse Pile 140 PENDING <br />TOTAL 482.5 <br />n~pl+p~pn <br />These acreage values are based upon the revised figures found in <br />PR-02 (Southwest Mining District), and reflect the inclusion of the <br />connecting road allowing access to the railroad spur near Pond A, <br />along with additional disturbance and redisturbance of areas around <br />Pond F. The acreage associated with the coal refuse pile is for <br />the footprint of the entire pile, and part of this footprint lies <br />within disturbed area associated with the surface facilities. <br />