Laserfiche WebLink
STORMWATER ANNUAL REPORT -SAND alvD GRAVE <br />t~O:LORADO DEPT. OF PUBLl~ALTH & ENVIItONMENT <br />WaNr Qualiry'Control Division III IIIIIIIIIIIII III ~~CEIVED <br />WQCD-P-B2 1999 <br />4300 Cherry Creek Drive South 999 ApR 21 <br />Denver, Colorado 80246-1530 Geolo9Y <br />~., s.on of Mlaetats ~ <br />Make enough copies of form for each reporting year. Check box if this is a <br />l ~ ` - - new name, address, etc. <br />Permittee (Comp Name): ~ J ~~ ~ ~~ ~ ~ \ ~ ^ <br />Fac.iliry Name: ^ <br />Mailing Address: ^ <br />Facility Phone Number: X30`3 ~~,2,`~- (Q N-~~ ^ <br />Permit Certification No. COG-50~~~..~ Q~-0..'C-'r`~ <br />Reporting Period: Jan. 1-Dec. 31, 19 _ _ (Form is due by Feb. 15 of the following year) <br />=f:Each section must be completed. Please print or type.ss <br />A. <br />B <br />Were changes made to your SWMP? ~No ^ Yes -Describe changes on a separate sheet. <br />A summary of each comprehensive stormwater facility inspection made, including date, findirtrs, and <br />action taken. (The permit requires at least two comprehensive facility inspections per year -see page 8 of <br />the permit. Include here a mmmary of those inspections, plus any other comprehensive inspections <br />made. It is not necessary to cnmmari~a day-today inspections, tmless significant problems were noted.) <br />First Inspection -Date _/_/_. Findings, and action taken: <br />Note -form ruay be reproduced Page 1 of ~2 u9/97eq <br />A report on the facility's overall compliance with the SWMP. (Include here a ~,mmary of any measures <br />taken to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or <br />improvements made in any of your Best Management Practices (BMPs), employee training, spills, other <br />problems encountered, etc..How is your plan working?) <br />