Laserfiche WebLink
Third Party Oversight 14 Water, Weste & Lend, Inc. <br />Sen Luis Mine June 9, 1994 <br />WWL's opinion is that the Raise I Embankment material (Type 11 that was utilized is <br />acceptable and should generally function as intended. However, as discussed in Section 4.3, <br />piezometers should be installed to verify that the embankment and tailings near the <br />embankment are performing as designed (DMG, 1993m). The piezometers which were <br />recommended for monitoring of the phreatic surface within the embankment and tailings near <br />the embankment were not mentioned in the Final Construction Report (SRK, 1994). <br />1 <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br />r <br /> <br /> <br /> <br /> <br /> <br />~~ <br /> <br />