Laserfiche WebLink
Introduction <br />According to Stipulation No. 29, Permit No. C-81-038, the operator submits the following Annual Mine <br />Inflow Report for the period of July 1,1999 through June 30, 2000. <br />Minine Locations and Projections <br />Mining operations at Bowie No. 1 Mine have temporarily ceased due to mazket conditions and coal quality <br />issues. It is unclear at this time where mining operations would resume in the event that this coal reserve <br />becomes economically viable. <br />Mine Inlow <br />The underground Mine Inflow Study at the Bowie No. 1 Mine was not conducted during 2000, as the mine <br />was inactive and inaccessible. <br />No water was discharged from the mine to the surface during the 1999-2000 reporting period. The <br />operator has no plans to dischazge water from within the mine to the surface during the 2000-2001 <br />reporting period. No water has been dischazged from the mine to date. <br />Water Importation and Balance <br />There was no production of coal from the Bowie No. 1 Mine from July I , 1999 through June 30, 2000. <br />Production estimates for the following twelve month period remain at zero. Historically, mine water <br />importation is estimated from recorded flows and related tonnages at the mine from September,1985 <br />through April 1986. With no coal production to base water usage upon, the operator submits only water <br />used for the bath house, dust suppression at the Bowie No. L mine facilities and dust suppression at the <br />Unit Train Loadout. The bath house has not been used since Mazch of 1999. <br />• These water quantities aze listed as: <br />Acre Feet <br />Dust Suppression on Bowie No. I Roadway .......................................... 0.00 <br />Bathhouse Consumption2 ......................................................... 0.00 <br />Evaporative Loss from Ponds ...................................................... 4.60 <br />Silo Usaee' ................................................................... 7.46 <br />Total water usage 12.06 <br />I3ydroloEic Impacts <br />There was virtually no water inflow into the mine. Therefore, the hydrologic impact caused by the mining <br />operation is either non-existent or not measurable. <br />Conclusions <br />No mine discharge and minimal importation of water is anticipated during the 2000-2001 reporting period. <br />Therefore, the quality and quantity of surface water adjacent to the mine will not be affected. The operator <br />will continue to submit the Annual Subsidence and Hydrology Report which will summarize all subsidence <br />and hydrology data. <br />~No or minimal consumption <br />ZBathouse no longer in use. <br />• 'Calculated from meter readings at the Unit Train Loadout water meter. <br />