Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />Location: Foidel Greek Mine Report No.: 31 <br />Client: Bower Brothers Construction <br />Work Performed: <br />Date: 05122!98 <br />Time: 3.0 <br />Mileage: 40 <br />Engr./Tech: JK <br />As requested, we visited the project site on this date to conduct nuclear density test No.'s 129 through 132 on the <br />materials placed. <br />Bower Brothers' crews had placed and compacted stockpile waste coal material in Area No. 1 of the project. We <br />obtained moisture samples from each test site and also obtained a sample of the material for checkpoint Proctor <br />determination. The checkpoint Proctor matched No. 3 for this project. <br />Remarks: <br />The material tested generally met with project specifications for compaction. Moisture contents ranged from 1.7% <br />to 3.5% above optimum. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers Construction was informed of today's test results. <br />