Laserfiche WebLink
Knight Piesold <br />G O N 8 4 L T I N 6 <br />November 7, 2005 <br />For: File <br />Knight Piesold and Co. <br />1050 Seventeenth Street, Suite 450 <br />Denver, Colorado 80265-2011 <br />U S.A. <br />Telephone (303J 629-8788 <br />Telefax (303) 629-8789 <br />VOUR REFERENCE <br />Re: Colowyo Coal Company L.P. (C-81-019) OUR REFERENCE <br />West Pit Fill Inspection Report and Certification <br />Fourth Quarter, 2005 <br />West Pit Fill Construction Report <br />During the quarter beginning October 2005 and ending December 2005, I inspected the azea in <br />which the West Pit Excess Spoil Fill is being constructed. The purpose of these inspections was <br />to inspect the fill surface for vegetative efforts, inspect the fill for azeas of water seepage or <br />surface drainage, and satisfy the requirements of CMDG Rule 4.09.1(11 a). <br />During the quarter, no progress was made on the West Pit FiH. No overburden was hauled to <br />backfill in the West Pit due to spoil room constraints. No sloping to final grade occurred. No <br />reclamation seeding was done during the quarter. No seepage was evident in the surface drain or <br />underdrain during the quarter. <br />Attached to this report is my certification that all construction requirements have been met thus <br />far in constructing the West Pit Excess Fill. <br />aye T. Pickarts, P.E. <br />Principal <br />xc: Mr. Kurds Blunt, Colowyo Coal Company, L.P. <br />West Pit Fill Construction Engineering Report <br />cf 4.5.2 2005 <br />