Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />Inter-office Memorandum <br />COLORADO <br />DIVISION O F <br />MIN~RALS <br />GEOLOGY <br />0.f CLAMATION•MININO <br />SAFETY•SCIENCE <br /> Bill Owens <br /> Gavemor <br />to: File, 2005 Annual Hydrology Report, C-1980-001, The Pittsburg & Midyy~l~~ <br /> Mining CO. Executive Director <br />from: Byron G. Walker Ronald W. Cattany <br /> <br />subject: <br />Review of 2005 Annual Hydrology Report, C-1980-001 Division Director <br />Natural Resource Trustee <br />date: March 1, 2006 <br />A 2005 Annual Hydrology Monitoring Report (Annual Hydrologic Report, AHR) for the Edna <br />Mine CDMG Permit No. C-001-80 was dated February 2005. It was prepared for The Pittsburg <br />& Midway Coal Mining Company by WWC Engineering (WWC), and submitted to the Colorado <br />Division of Minerals and Geology (Division) under a WWC letter dated February 13, 2006. <br />Table of Contents <br />Rule 4.05.1(1) ......................................................................................... .......................................1 <br />Rule 4.05.1(2} .......................................................................................... ......................................2 <br />Rule 4.05.1(3) .......................................................................................... ......................................2 <br />Rule 4.05.12 ............................................................................................. ......................................2 <br />Rule 4.05.12(1) ........................................................................................ ......................................2 <br />Rule 4.05.12(2) ........................................................................................ ......................................3 <br />Rule 4.05.12(3) ........................................................................................ ......................................3 <br />Rule 4.05.13(4) ........................................................................................ ......................................3 <br />Rule 4.05.13(4)(a) .................................................................................... ......................................3 <br />Rule 4.05.13(4)(b) .................................................................................... ......................................3 <br />Rule 4.05.13(4)(c) .................................................................................... ......................................3 <br />Rule 4.05.13(4)(c)(i) ................................................................................ ......................................3 <br />Rule 4.05.13(4)(c)(ii) ............................................................................... ......................................3 <br />Rule 4.05.13(4)(c)(iii) .............................................................................. ......................................4 <br />Review of Predicted Probable Hydrologic Consequences ....................... ......................................5 <br />CWQCCR 31 ........................................................................................... ......................................6 <br />CWQCCR 31.11 ...................................................................................... ......................................7 <br />CWQCCR 33.0 ........................................................................................ ......................................7 <br />CWQCCR 41 ........................................................................................... ......................................7 <br />Colorado Discharge Permit System ......................................................... ......................................8 <br />Rule 4.05.1(1) Surface and underground mining activities shall be planned and conducted to <br />minimize disturbance of the prevailing hydrologic balance in both the mine plan and adjacent <br />Page 1 <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />