.. <br />Additional Page <br />1999-2000 Annual Report <br />Snyder Quarry <br />M-77-210 <br />Castle Concrete Company <br />Anniversary Date: May 27 <br />Overview of Permit Year: During the 1999-2000 operating year there was low, but increasing activity at this <br />site. The operation is slowly being increased back to a level of significant production. <br />Annual Report Maps: The attached map shows the primary areas of disturbance and the type of <br />disturbance occurring in each area. <br />Affected Lands: The amount of affected land has not increased primarily due to the activity being <br />confined to previously disturbed land. The large waste pile has been further reduced and placed in the <br />excavation at the back of the quarry. A small amount of excavation has occurred just north of the scale and <br />plant. This removed a small amount of exposed limestone that needed to be removed to make room for <br />further access. The West Ridge was examined and consideration is being given as to how it will be mined. <br />As noted in the plan, the problem here are the underground workings that are difficult if mining above <br />those workings and, eventually, into them. Consideration is also being given to initiating work in the <br />northwestern corner with, first, the establishment of the drainage basin at the bottom of the drainage. <br />Revegetation: The site is stable and is not subject to erosion. No additional revegetation was done. What <br />was done in the past is in excellent condition. <br />Road Corridor: The road corridor has been improved and graded. Tree plantings along the lower portion <br />of the road have done moderately well and have sufficient survival, if it continues, to introduce significant <br />visual improvement. <br />Expected Activity (2000 - 2001): During the next year activity to prepare the site for higher production <br />will continue. This will involve continued movement of various waste materials into mined out areas where <br />it is out of the way. It is possible that all or a part of the West Ridge will be mined. It is also possible that <br />an access road across the crest of the North Wall will be built into the West Drainage where the sediment <br />basin will be built and the first mining of that area started. <br />Bonding: This operation is covered by a corporate bond. <br />Recent Inspections: The site was inspected by the Division on February I, 2000 (note: inspection date on <br />report is in error). Only problem was the need for submitting a geotechnical stability report. That report is <br />being prepared by Banks and Gesso. <br />Castle Concrete 2000 Annual Report M-77-210 Snyder Quarry Page 1 of 1 <br />