Laserfiche WebLink
ABRA~WS <br />III IIIIIIIIIIIII III <br />EASTSIDE COAL COMPANY, INC. <br />P. O. Box 161 <br />Silt, Colondo 81652 <br />(303) 8762944 <br />February 10, 1986 <br />HYDROLOGY ANNUAL REPORT <br />EXTENT OF MINING <br />s','~ ~~ <br />FEB 13 1986 <br />d,;9iG. i~GPY. OI plgt~~~84 paSOE{(LL'u <br />Eastside Coal Co., Inc. has advanced the portals approximately <br />600 feet from the portals to the east. Two entries are driven <br />on the strike. The mining advance is shown on the HGP-4A copy <br />which is enclosed. <br />IMPACTS ON SURFACE & GROUND WATER <br />The data obtained from the monitoring program is listed on the <br />enclosed tables for Flow and Field Parameters and Chemical <br />Parameters. A comparison of the data with the baseline information <br />does not indicate any impacts on either ground or surface water <br />due to mining. <br />Copies of the Lab results from ACZ are also enclosed for your review. <br />