Laserfiche WebLink
Pitch <br />Apri114,2006 <br />• Monitor water release in accordance with the CDPS permit; <br />• Conduct monthly monitoring and reporting pursuant to the CDPS permit at compliance <br />point SW-33; <br />Conduct annual surveys of the slope monitoring monuments; and <br />Monitor waste rock dumps and sediment control embankment. <br />8.0 <br />• <br />REFERENCES <br />Consulting, Inc., November 2005, Vector Analysis of Pit Slope Displacement -Pitch <br />imation Project. <br /> <br />