Laserfiche WebLink
• • ~, . , <br />ANNUAL REPORT <br />INSTRUCTIONS <br />. ! s.,;. <br />According to C.R.S. 34-33-I 16(3), and C.R.S. 34-32.5-I 16(3)(x), on the anniversary date of the permit each year, <br />the operator shall submit a report and a map showing the extent of current disturbances to affected land. <br />reclamation accomplished to date and durine the preceding year, new disturbances that are anticipated to occur <br />Burin, the upcoming year, and reclamation that will be performed during the upcoming year. Please atutch such <br />a report and map to enclosed annual report form. (An adequately labeled map [hat clearly delineates and includes <br />the above elements may suffice for a written report.) , <br />If your operation is subject to the provisions of Temp racy Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following info anon as required by 2 CCR 407-1, 407-4, and Rulers <br />1.13.7(I)(a): <br />(I) the condition of the operation a e time of cessation: <br />(ii) what specific measures have een and will be implemented to comply with reclamation, <br />performance standards and En ronmental Protection Plan requirements, if they are pan of your <br />approved application; and <br />(iii) plans for resumption~6f mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(I) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(a), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of CCR 407-1, 407-4, and Rules Lli(l)(b), permits secured with a <br />Deed of Trust or a Secu y Agreement, [he operator shall submit an update, by a qualified <br />independent appraise ,indicating any changes in property value, and a statement summarizing <br />any circumstance hich may affect the adequacy of the Deed of Trust, or Security Agreement. <br />and'the value the property subject [o either of these instruments. <br />The report all also provide proof that there are no past-due property taxes. - <br />(iii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the <br />Letter of Credit does not exceed ten percent (10%) of the bank's capital surplus accounts. <br />(vi) Per the requi en[s of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien o any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to f describe the condition, value, and location of all pledged fixtures <br />and eq ment. <br />(b) Per the require nts of 2 CCR 407-1, 407-4, and Rules 1.15(l)(c), all monitoring information <br />required as part the approved permit application, to include the'Erivifoftmental Protection Plan. <br />(Please not at if you are not a Designated Mining Operation, you will not have an Environmental <br />Protecti Plan as part of your approved permit.) <br />