Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />N• a of Intent to Continue Mining Operations 999 <br />112 Annual Report <br /> <br />PermitteeName: Pete Lien & Sons, Inc. d/b/a ..,. <br />Colorado Lien Company ' •~~~/v <br />Permit Number: M-77-304 ,. ~~.L <br />Operation Name: Rex Quarry -Sec 36 % ^ <br />' "• <br /> <br />Anniversary Date: 09/24/98 ~. <br />. <br />'=ron~~' . -~ <br />~~~° <br />Total $550.00 (Due on your anniversary date) <br />rarsdG~~~J <br />1. a. Permitted acreage: 360 <br />b. County where mine is located: Latimer <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? NO <br />Does this mine operate MORE or LESS than 180 days per year? MORE <br />3. Does this mine have a phased reclamation plan? YES <br />4. Maximum acreage to be affected total for life of mine: 147.2 acres <br />Maximum acreage to be affected at one time (bonded): 114.8 acres <br />Total acres affected during the report year:* 107.4 old + 0 new - 21.2 pre-74 =86.2 total <br />5. Total acres reclaimed for the report year: * none released <br />a. Acres backfilled 9.4 old +3.0 new =12.4 total b. Acres graded 11.5 old +3.0 new =14.5 total <br />6. Total number of acres in topsoil replacement stage: 4.3 done in 1998, 3.0 acres ready <br />a. Average thickness of topsoil replaced: 4 inches <br />7. Total number of acres seeded: 4.9 old + 4.3 new = 9.2 total <br />a. List species seeded & seeding rate for report year See enclosure <br />8. For non-phased operations provide dates extraction ceased Not applicable <br />a. Date reclamation began Not applicable <br />9 The type and approximate quantity of fertilizers, organic material or soil conditioners used for the report year: <br />No fertilizers or soil additives are used, but beet dirt is mixed with native soil or used in lieu of it. <br />10. Estimated total acres to be affected in the next report year: 0 acres new <br />11. COMMENTS: <br />144,000 tons mined. Most mining is in previously dsturbed areas. Areas in this report are based on new mapping of site and therefore do not <br />match past reports. See attached map. Above totals do trot include pre-1974/pre-law affected land outside the bonded an~a. Now bac~lling 2.1 <br />acres. <br />' Please show the location of the acreage for items 46 on your map". Indicate the phases of the reclamation which have <br />been completed, correlated with your timetable. <br />"NOTE: If there have not been any changes since the last annual report and you previously submitted a map which <br />correctly depicts the current acreage in items 2 thru 6, then a new map is unnecessary. However, this must be stated <br />above. n <br />Signature: Date: /~ ~ $ <br />Please type or print the curve t contact name, mailing address, and phone number below <br />IN COLORADO: ENVIRONMENTAL: LEGAL: <br />Rob Kisner, Lecia Craft, Craig Grotenhouse, Esq., General <br />Quarry Superintendent Environmental Engineer Counsel <br />Colorado Lien Company Pete Lien 8 Sons, Inc. Pete Lien 8 Sons, Inc. <br />P.O. Box 1961 P.O. Box 767 P.O. Box 440 <br />Fort Collins, CO 80225-1961 Rapid City, SD 57709-0767 Rapid City, SD 5770&0440 <br />(303) 493-6294 (605) 394-7228 (605) 342-7224 <br />Federal Tax ID No. or Social Security No. <br />