My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP21952
DRMS
>
Back File Migration
>
Report
>
REP21952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:03 PM
Creation date
11/27/2007 3:18:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Report
Doc Date
2/20/2002
Doc Name
2001 Annual Reclamation Report
From
WWC Engineering
To
DMG
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br />2001 Field Maintenance Work at Edna Mine <br />The attached map shows the location of the following maintenance work, which needs to be <br />accomplished at the Edna Mine. The item listing corresponds to the number listing on the map. <br />Repairs shown in red on the map. <br />I. Culvert E-12 -clean inlet sump and outlet. Clean out culvert. <br />2. Culvert E-1-clean inlet sump and outlet. <br />3. Expand low water crossing at the "Y" of Skyline Road and West Ridge Road to the <br />north, making the bottom wider and the transition less abrupt. <br />4. Check Dam 7 -Backfill and compact dirt in spillway to grade. Redistribute rock in check <br />dam. <br />5. Check Dam 8 -Backfill and compact dirt in spillway to grade. Redistribute rock in check <br />dam. <br />6. Goat Trail, ls` Switch back- clean out ditch, reshape inside ditch to make sure runoff <br />stays against slope side of road. <br />7. Goat Trail, Culvert TA-3 -clean inlet sump and outlet. <br />8. Goat Trail, Culvert TA-6 -clean sediment out of concrete box inlet. <br />9. Terrace 3 -Regrade Terrace 3 from the intersection with Terrace 4 approximately 200 <br />feet east. Seed the disturbed areas. <br />10. Terrace 6 -Regrade Terrace 6 below the rock channel approximately 100 feet east. Seed <br />the disturbed areas. <br />11. West Ridge Road -crown road and repair ditch on north side of road from West Ridge <br />Drainage check dams southeast through the road cut. Contour furrow and seed rills along <br />north side of the road. <br />12. West Ridge Road -Blade road from the Shop Buildings to the Center Ridge Drainage. <br />13. North Road -repair ditch and blade rilling in the gravel area east of the road and south of <br />Culvert E-12 (the former fueling area). <br />14. North Road -add gravel to approximately 200 yards of "soft" areas located south of the <br />green gate and blade the road from the green gate to Culvert E-5. <br />15. Backfill gully from center haul road along the south side of the ridge to Lower Moffat <br />Road with soil imported for this purpose. Contour furrow and seed the backfilled gully. <br />16. Backfill gully located south of Moffat Down Drain #2 with soil imported for this <br />purpose. Contour furrow and seed the backfilled gully. <br />17. Backfill the gully located south of Moffat Down Drain #1 with soil imported for this <br />purpose. Contour furrow and seed the backfilled gully. <br />18. Backfill the separation zone located parallel to the North Road east of Moffat Down <br />Drain #4 with soil imported for this purpose and seed. <br />19. Backftll rills and gullies located in adjacent to the Moffat Final Pit Segment 4 Ditch with <br />soil imported for this purpose, contour furrow and seed. <br />20. Backfill rills and gullies located in adjacent to the Moffat Final Pit Segment 3 Ditch with <br />soil imported for this purpose, contour furrow and seed. <br />21. Lower Moffat Road -Contour furrow and seed rills along west side of the road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.