Laserfiche WebLink
5. The waste dump is being constructed using recognized professional <br />standards. <br />6. All vegetative and organic matter has been removed from the <br />disposal area, and the topsoil has been stripped and stock- <br />piled for future use. <br />7. Slope protection has been provided in the form of contour dis- <br />cing and hydro-mulching to minimize surface erosion. <br />8. No underdrainage systems were required. <br />9. The waste dump fill appears to have been constr~,uc~fedl'as syp`ee- <br />~~ ,~ <br />ified in the design as approved by the Division) of~~i~,ined~~~.and ~' <br />r <br />Reel-amatibn. i . <br />The waste dump complies with the intent of the regulations. <br />John V. O'Laughlin <br />Professional Engineer <br />Colorado License No. 17342 <br />.~`N~ENT p ~'~•,, <br />O ~' <br />~~ ~, 2 <br />~~qAL E:°~O"~` . <br />~4un <br />. ~. VI, <br />