Laserfiche WebLink
/~~- ~ <br />FILL PLACEMENT <br />CDMG regulations require that spoil be "placed in horizontal lifrs iu a controlled manner, concurrently <br />compacted as necessary to ensure mass stability". Maximum lift thicknesses are not specified. Lifrs were <br />placed maccordance/w/ith plans specified by the CTL Thompson report. <br />COVER MATERIAL <br />Final till configuration has not been obtained and no cover material placed on the excess spoil. <br />DOCUMENTATION <br /> <br />CERTIFICATION <br />Inspection was conducted by Ronald G. Thompson, a qualified professional and MSHA certified inspector <br />of earth and rockfill embankments and impoundments, under the direction of Mc Charles McGlothlin. <br />This is to certify, to the best of my knowledge and belief, that Fill No. 8 construction and placement, as <br />noted since the previous certification and as determined during this inspection and discussions with mine <br />personnel, is in accordance with designs as proposed by CTL Thompson in their report dated April 27 and <br />amended July 27, 2001 and as approved by the Division of Minerals and Geology. <br />~~~ <br />Ronald G. Thompson <br />Inspector ~~ /~ 7~ <br />a ~ ~o ~ <br />~ .p~ttl neap:dp~ <br />1 J ~ .~. ~ ~ T _ _ ~•,, <br />~ : ~~ <br />~ . ti' <br />Ch les W. McG othlin ~ .rt ~- ~- "~. ~_: <br />_~ - -- <br />Professional Engineer - '-:: ,,? '~ `-~- -- <br />_ `, _f <br />j <br />.'} ! __ <br /><ol ~~ _ <br />48:.;,,:,.: <br />inspections completed in compliance with Rule 4.09.1(11)(b) must be submitted to the Division within lwo weeks. <br />