Laserfiche WebLink
iiiiiiiiiiiiiium <br />999 <br /> <br />RECEIVE` <br />March 18, 1999 r IN`~3 2 2 1~J9~ <br />.: un of rvt~rerals & Ge010yy <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Rle: Battle Mountain Resources, Inc. - San Luis Project <br />~ DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />'~ March 14, 1999 - March 20, 1999 <br />Dear Mr. Dillie: <br />Alttached is a summary of the cyanide analysis performed on samples <br />the tailings pond and the collection pond during the week of March <br />1999 - March 20, 1999 as required by the approved TR-010. <br />D ring the week, the tailings pond averaged 0.050 ppm CN-wad and 1 <br />p~m CN-total. The collection pond averaged 0.021 ppm CN-wad and 0. <br />ppm CN-total. <br />i <br />Sincerely, <br />~~ <br />Ron Zum~ waltt~ <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />from <br />14, <br />.075 <br />027 <br />