Laserfiche WebLink
• The two wells, WR-2 and WR-3 were completed above and <br />below the initial waste rock pile. Monthly water <br />level recordings were initiated in September 1981. <br />Well WR-2 was destroyed in June 1982 during construc- <br />tion of the parking lot and shop warehouse. A new <br />well, WR-2 was completed in November, 1982 at a loca- <br />tion 49 feet upslope of the original well. Wells <br />SOM-2H and SOM-16H were completed in late October, <br />1981. These wells monitor water levels in the F-coal <br />seam updip of the permit boundary. Deep snow cover <br />did not permit winter monitoring of these two wells. <br />Monthly monitoring of water levels commenced in May, <br />1982. <br />• Well water level hydrographs from January, 1980 <br />through Water Year 1982 are provided in Appendix C. <br />Water levels and corresponding monitoring dates are <br />tabulated in the quarterly monitoring reports. <br />Wells SOM-38-H-1 and SOM-38-H-2 were obstructed. <br />Obstructions were cleared in October, 1981. The data <br />from that point on is considered good for SOM-38-1, <br />however, SOM-38-2 experienced further problems with <br />obstructions in 1982. <br />• <br />-21- <br />