Laserfiche WebLink
<br />DELTA COUNTY <br />ANTELOPE HILL PIT <br />1999 ANNUAL REPORT <br />No. M-78-172 <br /> <br />The accompanying map shows the area of projected activity for the year 2000, the area mined in <br />1999, the area reclaimed to date, and the extent of prior years disturbance. <br />Antelope Hill Pit is one of several operated by Delta County and is mined as needed for county <br />projects or grovel reserves. Della County crushes and processes the gravel in each of its pits with a <br />]sortable crushing plant. It is anticipated the portable crusher will be moved to the Antelope Hill Pit in <br />'ebruary or March 2000 and will operate there 2-3 months. The gravel produced will be stockpiled. The <br />:s no reclamation projected for 2000. The mining operation is approaching a county road that traverses <br />'he middle of the pi[ and is underlain with gravel. The road will need [o be relocated south of its present <br />oca[ion into the area proposed for mining in 2000. The road relocation will have [o be done before any <br />~:orresponding reclamation can be done at that area. <br />