My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP21770
DRMS
>
Back File Migration
>
Report
>
REP21770
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:54:57 PM
Creation date
11/27/2007 3:15:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Report
Doc Date
5/26/2005
Doc Name
1st Quarter 2005 Wastebank Inspection Reports
From
Peak Project Management, LLC
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spoil pill t18, <br />March 30, 20115 <br />Page 2 <br />FILL PLACEMENT <br />Fill material has been completed in accordance with the approved plan. <br />COVER MATERIAL <br />Final fill co~guration has been established and topsoil material has been placed on the excess spoil-fill. <br />The area was mulched and seeded in the fourth quarter of 2003. Soil was placed and spread on the upper <br />most surface of the fill in May of 2004. Tiris area was being seeded during the inspection. A copy of the <br />seed and mulch certifications is attached. <br />STRUCTURAL INTEGRITY <br />The entire excess spoil fill facility was examined for signs of ftilurc and instability such as tension cracks, <br />ground movement, springs and seeps, and standing water. No indication of potential instability was <br />observed. <br />DOCUMENTATION AND OTHER OBSERVATIONS <br />Lateral drainage ditches have been reestablished and are functional. Final grading still needs to be <br />completed. Minor rills and gullies an the front slopes should be 611ed with soil. All areas disturbed as a <br />result of maintenance should be reseeded prior to the next growing season. When work is completed the <br />affected areas should be resurveyed and certified. <br />CERTIFICATION <br />Inspection was conducted by Ronald G. Thompson, a qualified professional and MSHA certified inspector <br />of earth and rockfill embankments and impoundments, under the direction of Mr. Charles McGlothlin, a <br />registered professional engineer licensed in the State oC Colorado. <br />This is to certify, to the best of my knowledge and belief, that Fill No. K constn~ction and placement, as <br />noted since the previous certification and as determined during this inspection and discussions with mine <br />personnel, is in accordance with designs as proposed by CTL Thompson in their report dated April 27 and <br />amended July 27, 2001 and as approved by the Division of Minerals and Geology. <br /> <br />Ronald G. Thompson <br />Inspector <br />., <br />,. <br />r 1 <br />1 ~ ;.;, _ , , ~ (,, . . <br />Charles W. McGlot din ~ ` ~ " ~ ~ ~"./ Vcg, . ' - <br />Professional Engineer <br />~, i. - <br />~~ '. <br />' <br />~' < <br />.. . <br />~. <br /> ;~„~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.