Laserfiche WebLink
otice of Intent to Continue Mintng_Operations <br />112c Construction Materials Annrial Report <br />Permittee Name: ANDESITE ROCK COMPANY <br />Permit No.: M-1988-048 <br />Operations Name: CARR GRAVEL RESOURCE <br />Anniversary Date: September 22, 2008 <br />Total: $888.00 (Due on or before Anniversary Datel <br />1, a. Permitted acreage: 1412 +/- b. County where mine is located <br />2. Has this mine been granted Temporary Cessation Status? <br />Does this mine operate MORE or LESS than 180 days per year? <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during the report year: ' <br />a. Total acres affected to date <br />5. Total acres reclaimed for the report year: <br />6. Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or <br />RECEIVED <br />SEP 1 12006 <br />Division of Reclamation, <br />Mining and Safety <br />WELD <br />~S ZlQ <br />MARE ~E~S <br />~ A!® <br />approx. 40 <br />760 <br />45 <br />15 <br />4" <br />as per permit <br />n/a <br />soil conditioners used for the report year: ` n/a <br />10. Estimated total acres to be affected in the next report year: ' 50 <br />11. Comments: <br />The mining for this vear was back into the originally permitted acreage in an area located south <br />of the processing plant (where we had been mining lust previous to mining the amendment <br />acreage). We currently have active mining operations in this area, and will continue in this area <br />for at least another vear. We have toosoiled and seeded the area we mined last vear. The <br />seeding is per the seed mix in the permit. Please see the attached map for areas. <br />' Please show the location of the acreage for items 4-6 on your map". Indicate the phases of the reclamation which have been <br />completed, correlated with your timetable. For phased operations, show dates extraction ceased and dates reclamation began. <br />"NOTE: If there have not been any changes since the last annual report and you previously submitted a map which correctly <br />depicts the current acreage in items 2 through 6, then a map is unnecessary. However, this must be stated. G} <br />Signature: ~~~~ i~ZG~ Date: / <br />-~ <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: Lvnn Maver Shults Phone: 303-287-2247 <br />Company: L G. Everist Inc dba Andesite Rock Comoanv Fax : 303-289-1348 <br />Address: 7321 East 88`" Avenue. Suite 200 Henderson CO 80640 Email: ImshultsCa)Igeverist.com <br />Federal Tax ID: Andesite Rock Comoanv <br /> <br />