Laserfiche WebLink
APPENDIX A: PLOT LOCATIONS <br /> <br />95-4A & B: Planting Unit 95-4 is divided into two separate units as part of an ongoing study. <br />Planting Unit 95-4A is on the non-topsoiled portion of the study site. The baseline runs along <br />the west border of the site (Bo, B,~) with endpoints at metal posts marked with aluminum tags. <br />Transects aze perpendiculaz and located at 3, 10, 14, 18, 20, 24, 30, 32, 36, and 44 meters. <br />Planting Unit 95-4B is on the topsoiled portion of the study site. The baseline runs along the <br />west border ofthe site (Bo, B44) with endpoints at metal posts mazked with aluminum tags. <br />Transects are perpendicular and located at 6, 12, 16, 20, 24, 28, 30, 34, 38, and 40 meters. <br />Endpoints of the transects are mazked with wooden stakes. <br />96-I: Planting Unit 96-1 utilized two baselines. B1 runs along the southeast border of the unit <br />and is marked with aluminum tags on metal boundary posts (Bo, B45). Transects are <br />perpendicular and located at 0, 15, 30, and 45 meters. B2 is also located along the southeast <br />border of the unit and is marked with aluminum tags on metal boundary posts (Bo, B45). <br />Transects aze perpendiculaz and located at 0, 15, 30, and 45 meters. Endpoints of the transects <br />aze mazked with wooden stakes. <br />96-2: Planting Unit 96-2 utilized two baselines. B1 runs along the eastern border of the site and <br />is marked with aluminum tags on metal boundary posts (Bo, B45). Transects aze perpendiculaz <br />and located at 0, 15, 30, and 45 meters. B2 runs along the eastern border of the site and is <br />mazked with aluminum tags on metal boundary posts (Bo, B45). Transects aze perpendicular and <br />located at 0, 15, 30, and 45 meters. Endpoints of the transects aze mazked with wooden stakes. <br />96-1W: Planting Unit 96-1 W-1 utilized two baselines. B1 runs along the southern border of the <br />' unit and is mazked with aluminum tags on metal boundary posts (Bo, B45). Transects aze <br />perpendicular and located at 0, 15, 30, and 45 meters. B2 is located directly to the north of B 1, <br />runs along the center of the unit, and is marked with aluminum tags on metal boundary posts (Bo, <br />' B45). Transects aze perpendiculaz and located at 0, 15, 30, and 45 meters. Endpoints of the <br />transects are marked with wooden stakes. <br />' 97-1A: Monitoring plot 97-1A is the first of four monitoring plots utilized on planting unit 97-1. <br />The baseline begins near the junction of the drainage and access road and runs south. The <br />baseline is marked with aluminum tags on metal boundary posts (Bo, B45). Transects are <br />' perpendicular and located at 6, 11, 20, 32, and 41 meters. Endpoints of the transects aze mazked <br />with wooden stakes. <br />' 97-1B: Monitoring plot 97-1B is the second of four monitoring plots utilized on planting unit 97- <br />1. The plot is adjacent to and southwest of the sediment point. The baseline begins along the <br />' south edge of the sediment pond and extends northward. The baseline is mazked with aluminum <br />tags on metal boundary posts (Bo, B45). Transects aze perpendiculaz and located at 4, 9, 15, 27, <br />and 39 meters. Endpoints of the transects aze mazked with wooden stakes. <br />97-IC: Monitoring plot 97-1 C is the third of four monitoring plots utilized on planting unit 97-1. <br />' 22 <br />