My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP21544
DRMS
>
Back File Migration
>
Report
>
REP21544
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:54:51 PM
Creation date
11/27/2007 3:11:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
3/6/1995
Doc Name
MEMO COLOWYO MINE C-81-019 1994 AHR REVIEW
From
DMG
To
ERICA CROSBY
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />STATE OF III IIIIIIIIIIIII III <br />999 <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman 51., Roam 2 15 <br /> <br />Denver, Colorado 80203 ~I~~ <br />Phone. (3031 8h6-3567 <br />FA%. (3031 832-8106 <br /> DEPARTMENT OF <br /> ICES <br />DATE: March 6, 1995 RE OLTR <br /> <br />TO: <br />Susan Burgmaier Roy Romer <br />co~ernnr <br /> C lames 5 L«hhead <br />FROM: Erica Crosby G e.e~~~~~eoir«~nr <br /> Michael 8. Long <br />RE: COlOWyO Mine (C-81-019) Division Drreciar <br /> 1994 AHR Review <br />Susan, the Colowyo 1994 AHR has arrived. According to your memo <br />dated February 14, 1995, you are to review all of the Colowyo AHR. <br />It appears that the operator performed the monitoring required in <br />the permit. This report also contains the ARR, pond inspections, <br />fill inspections, NPDES reports etc.. Also enclosed is your 1993 <br />AHR review. Hopefully, all of your concerns have been addressed. <br />I have a few comments regarding the report; <br />1. The pond inspection reports have not been revised to conduct <br />annual sediment surveys of their ponds as noted in your 1993 <br />AHR review. Colowyo was made aware of this fact in December <br />of 1994. We should hopefully see a change in the 1995 pond <br />inspection reports. <br />2. Taylor Creek was not monitored in 1993 and 1994 because no <br />flow was noted. <br />3. Colowyo is required to conduct quarterly piezometer well <br />testing on the fills. I was unable to locate this data in <br />this report. Let me know if you can find it anywhere. <br />Please let me know if you have any questions or need additional <br />information. Thanks!!!!!!!!!!!!!!!!!!!!!!!!!!!! <br />c:\colowyo\950306 <br />
The URL can be used to link to this page
Your browser does not support the video tag.